Extras · 1 of 4

A typical day

Tools on site by 6:30 or 7. A stretch and a short talk about what is dangerous today. Then layout lines snapped on a deck, walls built flat and stood up, sheathing and windows in. Lunch out of a cooler at 11:30. Afternoon is whatever the crew is behind on, plus cleanup, because a messy site is how people get hurt. In winter, in a cold state, you do all of that in gloves. In July in the South you do it by 2pm and then drink water.