Extras · 1 of 4
A typical day
Morning: a grading plan for a new park, checking that every slope drains somewhere sensible. Late morning: a call with the civil engineer about a storm pond. Afternoon: a site visit to check the plants match the spec and walk the job with the contractor. End of day: renderings for a public meeting next week. Seasons matter. Spring and summer are site heavy; winter is drawing heavy.