Extras · 1 of 4
A typical day
On site by 7am. Read the drawings, lay out walls, cut and nail framing, set floor joists or roof trusses. On a tower, build and strip formwork for the next pour. On a renovation, tear out and rebuild while the homeowner watches. Lunch on a bucket. Clean up and charge tools before 3:30 or 4pm.